Our Key Differentiators

 
OntimeDelivery commitments as per ’Front of Load’ leads to higher adherence to on-time delivery
OntimeHassle-free process ensures reduction in cycle-time by ’not shifting the priorities’
OntimeCritical Chain Project Management provides early warning signals for no surprises
 
OntimeMR-24® Roof is a truly floating roof system with 360° double-lock seam. Roof panel is seamed at site to create the ’Tightest Seam’
OntimeStaggered end laps positioned exactly above purlins for sustaining foot traffic
OntimeRoof expansion joint is not required up to 250 feet due to free thermal movement of Roof Clip.
 
OntimeOur experienced team spends time to understand specific requirements and then suggests optimised solutions
OntimeAll secondary structural members are pre-punched for fixing the roof clips, structural components and accessories accurately.
OntimePre-punched roof panels do not require measuring, marking and drilling on site, which minimises chances of leakage.
 
OntimeDedicated Construction Safety Team follows ’Zero Tolerance’ approach to safety deviations
OntimeSKY-WEB II® System provides fall protection from the roof during construction
OntimeHigh Level of Mechanisation to reduce safety risks